Current Installation Status of IQ-50 Inline Turbidity Meter (2025.7.29)
- (더웨이브톡) 마케팅
- 2 hours ago
- 2 min read
IQ-50 is being adopted in testbeds at major water treatment plants and industrial sites both in South Korea and abroad.
By setting a new standard in turbidity monitoring, it is gaining attention in the market as an innovative technology that minimizes maintenance burden.

✅ Installed and Operating Sites
United States : 1 site installed; testbed completed
South Korea
- Mitan Water Treatment Plant, Gangwon-do : Installed and operational (Operated by Korea Environment Corporation, Pyeongchang Waterworks Office)
- Daegwallyeong Water Treatment Plant, Gangwon-do :Long-term PoC in progress (Operated by Korea Environment Corporation, Pyeongchang Waterworks Office)
✅On-site Installation Photos
✅ Scheduled Installations
United States :1 site scheduled for testbed installation
South Korea
- Pohang Branch, K-water : Scheduled for installation under the K-Testbed Program (August–September 2025, 1-year duration)
- OO Water Treatment Plant, Gwangju : Scheduled for PoC installation (early September 2025) (3-month PoC with potential follow-up purchase)
- OO Water Treatment Plant, Gangwon-do : Scheduled for PoC installation (September–early October 2025)(3-month PoC with potential follow-up purchase)
✅ Key Features of IQ-50 Inline Turbidity Sensor

Fully certified by the Korean EPA : Officially approved for use in municipal water systems in South Korea
Field-tested and deployed : Installed in domestic water treatment plants as part of real-world testbeds and operational use
Superior measurement stability : Maintains turbidity accuracy even under (Proven RSD < 5% in certified third-party tests)):
Severe pulsation
Aeration (bubbles)
Biofilm buildup
Low maintenance design : No need for frequent light source replacement, unlike traditional inline turbidity meters
Outperforms global competitors : Demonstrated up to 10× better stability in harsh flow conditions during certified testing
Ready for global expansion
: Collaborations with U.S. utility partners scheduled. North American EPA certification process to follow.
📧 Contact us : marketing@thewavetalk.com
Comments